Redland City Council installs water meters as per the SEQ Water Supply and Sewerage Design and Construction Code.
SEQ Code has standard drawings for the drinking water supply. The code details if a drawing is approved for use within a water service providers area.
Below is the Standard Drawing SEQ-WAT-1108-3 for an underground water meter installation. The water service provider that this standard drawing can be used in is highlighted in yellow. In this case this drawing/setup can only be used in the Unity Water area.

Standard Drawing SEQ-WAT-1108-3
Redland City Council standard drawings are:
- SEQ-WAT-1109-1 This drawing clearly states “Above ground meter”
- SEQ-WAT-1109-2 Showing the side view of the water meter installation with heights

Standard Drawing SEQ-WAT-1109-1

Standard Drawing SEQ-WAT-1109-2
In order for underground meters to be authorised for installation in the Redland City Council area, a change would be required to the SEQ Code.