Works update
What's happening in your neighbourhood?
The following works (listed by suburb) are underway or proposed to start in the next three months in the Redlands to improve your facilities. For more information, ph 3829 8963 or email us.
Alexandra Hills
61 McMillan Road
Demolish structures at 61 McMillan Rd; land purchased by RCC.
Capalaba
Redland Art Gallery Capalaba
Energy efficient lighting installation.
Cleveland
Redland Art Gallery Cleveland
Front door upgrade for disabled access.
Piermont Place Raby Bay
Revetment wall remediation works.
Raby Bay Boulevard Raby Bay
Revetment wall remediation works.
Killara Place
Construct carport across 4 car parking bays.
Asphalt overlay
Colburn St, Cleveland
Lamb Island
Boat Ramp Toe Planks
Installation of keying beam and toe planks as ramp maintenance.
Tina Avenue Foreshore Park
Remove hazard waste and asbestos including upgrade to embankment.
Pioneer Park Shelter
Remove existing shed and supply and install new shelter.
Macleay Island
Pats Park, Playground
New foreshore regional park playground.
Attunga Street Stage 1
Upgrade the section of Attunga St from Balaka St to the end of the cul de sac, which is approximately 340m. These works will include the placement of bitumen, installation of kerb and channelling and associated drainage works.
Timothy Street Stage 1
Upgrades to the existing gravel road in Timothy St between George St and Lot 103, which is approximately 200m. These upgrade works will include the placement of 2 coat bitumen seal, installation of kerb and channelling and associated drainage works.
Mount Cotton
Mt Cotton Village to State School Pathway Stage 2 link
Stage 2, 2.5 m shared use pathway from Sanctuary Dr to Community Park.
Seaview Road – Road Rehabilitation
Road reconstruction from Mount Cotton Rd to Darwallah St.
Mount Cotton Community Park
Supply and install a shade structure to cover the existing playground.
Installation of new amenities.
North Stradbroke Island
Amity Point swimming enclosure
Safety assessment on swimming enclosure and complete recommended action.
Point Lookout Headland Public Amenities
Demolish existing Captain Cook amenities and replace Headland Park Amenities with new toilet and shelter facility.
Natural Disaster Management Centre
Construct building within Dunwich depot.
Ormiston
Dog Off Leash Sturgeon St
Construction fenced (with koala proofing) dog off leash area with shelters, seating, signage, bin and bag dispenser with water bubble.
Dundas Street Park Ormiston
Install 1 set of soccer/rugby combination goal posts.
Redland Bay
Weinam Creek, Walkway and Pontoon
Removal of current pontoon and walkway, install alternative pontoon and walkway.
Esplanade Boat Ramp
Resurfacing of the Moores Rd Boat Ramp using standard toe planks.
Nev Stafford Park
Supply and Install new playground.
Denham Boulevard
Supply and install water bubbler, seat and shelter.
School of Arts Pedestrian Pathway
Extension of the existing culverts and installation of a 2.5m wide concrete pathway link along School of Arts Rd between Habitat Dr and Fielding Rd.
Russell Island
Jock Kennedy Park
Drainage upgrade for the access road to Jock Kennedy Park; this will include the installation of pipes along Esplanade, between Douglas and Alice Sts.
Canaipa Rd, Pathway
Stage 2 Construction of pathway from Akleba to Aquarius Dr.
Kennedy’s Farmhouse Balustrade Replacement
Replace existing balustrade to meet current standards.
Thornlands
MBC Eddie Santagulaina Way
Install path network signage from Cleveland to Thornlands along the MBC shared path link.
Pinklands Sporting Complex
Supply and Install Shelter.
Victoria Point
Pelican St, Victoria Point Seawall
Demolish existing wall and foreshore access stairs and reconstruct both.
Wilson Esplanade, corner Wilson St
Install concrete stairs with handrail.
Les Moore Park, Victoria Point
Install 2 sets of soccer/rugby combination goal posts.
Wellington Point
Asphalt overlay
Frederick Street, Wellington Point
Edith Street, Wellington Point